Disneyland Resort Pictures

Disneyland Parking Structure Construction Project Pictures (11/22/19)

Work continues on the makeover of the original tram stop and a new set of elevators for the Mickey & Friends Structure.

The Pixar Pals parking structure officially opened on Sunday June 30th and the new tram stop and security check area the week before on the first level. The structure is built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure. A new walkway utilizing a new pedestrian bridge across Magic Way to Downtown Disney opened on September 13th as well as most of the tram drop off area. The Pixar Pals Parking Structure consists of 5,000 spots spread across 6 levels (Incredibles, Coco, Cars, Monsters Inc, Finding Nemo, and Inside Out).

20191122 125741 wm 1

20191122 125743 wm

20191122 125834 wm 1

20191122 125830 wm

20191122 125837 wm 1

20191122 130002 wm 1

20191122 130015 wm 3

20191122 130022 wm

20191122 130009 wm 2

20191122 130031 wm

20191122 130104 wm

20191122 130058 wm 1

20191122 130119 wm

20191122 130115 wm

For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section

For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.

Here are videos from previous trips: