Pictures: Disneyland Hotel DVC Tower Construction (8/05/22)

The Disney Vacation Club tower construction at the Disneyland Hotel continues to rise.  The shell of the 8th floor is taking shape as the tower continues to rise.  Lower levels are being fitted with utilities and framing is underway.

For pictures from previous visits check out our Disneyland Construction Progress section or my full Disneyland Picture Sets


Other picture posts from this visit:

Leave a Comment