Disneyland Resort Pictures

​Disneyland Star Wars Construction Check (7/29)

This post has a quick check of the Star Wars preparations at Disneyland taken with my cell phone. For more pictures visit my full picture sets and/or our construction progress section.
A check of the site from the Mickey and Friends parking structure.

 

20160729 130039 wm

A pan across the site from left to right starting with the large mound of dirt.

20160729 130045 wm

The first section of the wall is complete and they have coated the bottom section.  On the left notics the steel i-beams are now in the ground.20160729 130048 wm

20160729 130051 wm

The wall along the big thunder trial.  Footers for more of the wall are taking shape

20160729 130054 wm 1

20160729 130056 wm

20160729 130059 wm

Towards the Hungary Bear

20160729 130102 wm

More beams staged in the area nearest the structure waiting to be installed.

20160729 130729 wm

Most of the pipes have been installed.

20160729 130737 wm

Footers for the Fantasmic marina are taking shape

20160729 130743 wm

Here you can start to see the new bend for the river.

20160729 131226 wm

20160729 131521 wm

From the Big Thunder Trail a look at the new wall along the old walkway.

20160729 155218 wm

20160729 155229 wm

The scaffolding is down from the buildinf on the island.

20160729 160532 wm
20160729 161033 wm

From near the canoe dock.

20160729 161240 wm

20160729 161248 wm

20160729 161251 wm

20160729 161302 wm

The old skyway walkways are gone and new trees planted.

20160729 180459 wm

20160729 180535 wm

20160729 180543 wm


Related Links