Disneyland Resort Pictures

Disneyland New Parking Structure Construction Pictures (6/29)

A new parking structure is being built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure with a projected opening in 2019. For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section

An overview video clip of the site:

The view from near the escalators.

20180629 125211 wm

Starting on the left/closest to Disneyland Drive and panning to the right in the next series of pictures.

20180629 125215 wm

Support columns are up and they are starting to assembled the temporary support structure for the second floor.  This area will be where the escalators will be.

20180629 125218 wm

20180629 125220 wm

20180629 125222 wm

In the center of site more holes are being drilled for support columns.

20180629 125227 wm

20180629 125224 wm

The side closest to the Mickey and Friends structure features several support columns up.

20180629 125402 wm

Rebar is being installed for the roadbed on the first set of ramps.

20180629 125406 wm

20180629 125409 wm

Support columns rising up.

20180629 125412 wm

20180629 125455 wm 1

20180629 125617 wm


For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.

Here are videos from previous trips: