Downtown Disney renovation projects continue.  There is some visible progress on the north side this week.  The 2nd floor area has been stripped down and looks ready for the new facade elements.

20180810 175422 wm

A closer look.

20180810 175425 wm

Repainting continues on the south side.

20180810 175428 wm

20180810 175427 wm

20180810 175520 wm

20180810 175523 wm

The construction walls between the Lego store and former Starbucks have been extended out.  The assumption is this will be the temporary entrance/exit path during the project with hotel guests entering from the right in this picture.

20180810 175836 wm

Tupua was performing again on the stage.

20180810 180130 wm

There were no other visible changes on the west side, security and all buildings were as they have been since July.