Disneyland Resort Pictures

Disneyland New Parking Structure Construction Pictures (10/19)

A new parking structure is being built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure with a projected opening in 2019. For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section.

A video overview from this visit:

 

The temporary supports and scaffolding are starting to be removed from sections of the escalator area.

20181019 125700 wm

The second floor appears complete all the way across.

20181019 125707 wm

20181019 125710 wm

The 4th floor connection is poured and supports for the 5th floor are rising up.20181019 130006 wm

20181019 125907 wm

Under the ramps a brick wall is being erected.

20181019 130028 wm

20181019 130033 wm

From the escalator

20181019 130418 wm

From ground level

20181019 130533 wm

From Magic Way. A pedestrian bridge will be added so you can walk to Downtown Disney and the parks without having to cross at street level.

20181019 130717 wm 1

Looking up at the 2nd floor while waiting to cross the street.

20181019 130920 wm


For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.

Here are videos from previous trips: