Day: May 7, 2019
Pictures: Magic Kingdom Retention Pond Construction (5/7/19)
A set of terraced retaining walls are being added to the retention pond outside the Magic Kingdom. Also you can
Read MorePictures: Magic Kingdom TRON Coaster Construction (5/7/19)
The TRON Coaster is starting to be assembled at the Magic Kingdom. The first track support pieces are being bolted
Read MorePictures: Epcot Entrance Construction (5/7/19)
The entrance to Epcot is beginning a transformation. Demolition work is underway
Read MorePictures: Sleepy Hollow/Castle Walkway Expansion Construction (5/7/19)
The walkway between Sleepy Hollow and Cinderella Castle is being widened at the Magic Kingdom in Walt Disney World
Read MorePictures: Guardians of the Galaxy Construction at Epcot (5/7/19)
A look at Guardians of the Galaxy coaster Construction at Epcot
Read MoreWDW Day 1: Morning at Disney’s Hollywood Studios (5/7/19)
I started my first morning at Disney’s Hollywood Studios. First a look at the new bus stops then Skyliner and
Read MorePictures: Disney’s Hollywood Studios Star Wars Galaxy’s Edge from Toy Story Land (5/7/19)
Ground level look at Star Wars: Galaxy’s Edge from Toy Story Land at Disney’s Hollywood Studios
Read More