Disneyland Resort Pictures

Disneyland Parking Structure Construction Project Pictures (12/03/19)

Work continues on the makeover of the original tram stop and a new set of elevators for the Mickey & Friends Structure.

The Pixar Pals parking structure officially opened on Sunday June 30th and the new tram stop and security check area the week before on the first level. The structure is built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure. A new walkway utilizing a new pedestrian bridge across Magic Way to Downtown Disney opened on September 13th as well as most of the tram drop off area. The Pixar Pals Parking Structure consists of 5,000 spots spread across 6 levels (Incredibles, Coco, Cars, Monsters Inc, Finding Nemo, and Inside Out).

20191203 133830 wm

20191203 133834 wm

20191203 133844 wm


20191203 133935 wm 1

20191203 133930 wm

20191203 134042 wm

20191203 133933 wm 1

20191203 133957 wm

20191203 134036 wm

20191203 133944 wm 1

20191203 134104 wm

20191203 134119 wm

20191203 133948 wm 2

For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section

For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.

Here are videos from previous trips: