A new parking structure is being built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure with a projected opening in 2019. For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section

A video overview to start off with:

The view from the corner nearest the escalators.

20180727 130438 wm

This will be the escalator area for the new structure. They have started the second floor.

20180727 130442 wm

Panning to the right.

20180727 130443 wm 1

20180727 130445 wm

Continuing to the right more support columns are rising up and concrete is starting to be poured for the ground level plus decking to act as a temporary support for the second leveling is being set up.

20180727 130449 wm 1

A better view of the second level support structure taking shape.

20180727 130508 wm

The ramp is being extended up to the third level.

20180727 1307350 wm

20180727 130740 wm

You can see the ground floor concrete section in the middle of this picture.

20180727 130511 wm

A closer look.

20180727 130749 wm 1

The next section of the ground floor is being leveled and prepared for concrete.

20180727 130753 wm 1

More utility work in the tram plaza.

20180727 130759 wm

The view from the escalator

20180727 131041 wm

20180727 131052 wm


For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.