A walk through Downtown Disney checking out the ongoing projects (8/10)
Downtown Disney renovation projects continue. There is some visible progress on the north side this week. The 2nd floor area has been stripped down and looks ready for the new facade elements.
A closer look.
Repainting continues on the south side.
The construction walls between the Lego store and former Starbucks have been extended out. The assumption is this will be the temporary entrance/exit path during the project with hotel guests entering from the right in this picture.
Tupua was performing again on the stage.
There were no other visible changes on the west side, security and all buildings were as they have been since July.