Disneyland Resort Pictures

Disneyland Parking Structure Construction Project Pictures (10/18/19)

Work continues on the makeover of the original tram stop and a new set of elevators for the Mickey & Friends Structure.

The Pixar Pals parking structure officially opened on Sunday June 30th and the new tram stop and security check area the week before on the first level. The structure is built on the former Pinocchio Parking lot adjacent to the Mickey and Friends Parking Structure. A new walkway utilizing a new pedestrian bridge across Magic Way to Downtown Disney opened on September 13th as well as most of the tram drop off area. The Pixar Pals Parking Structure consists of 5,000 spots spread across 6 levels (Incredibles, Coco, Cars, Monsters Inc, Finding Nemo, and Inside Out). Here is my post with pictures of the new walkway.

20191018 075330 wm

20191018 075333 wm

20191018 075401 wm 1


20191018 075407 wm

20191018 075357 wm

20191018 075427 wm20191018 075412 wm

20191018 075433 wm

20191018 075632 wm

20191018 075635 wm

20191018 075639 wm

20191018 075707 wm

20191018 075703 wm

20191018 075724 wm

20191018 075739 wm

20191018 075945 wm

20191018 075953 wm

20191018 080153 wm

20191018 075717 wm 1

20191018 080158 wm

For more pictures be sure to visit our full Disneyland Picture Set. For pictures of this project from past weeks be sure to visit the Disneyland Construction Progress Section

For more pictures be sure to visit our full Disneyland Picture Set Here are all my in park posts from Friday afternoon.

Here are videos from previous trips: